On Going Projects

  • Power Plants
    • ADEN Power Plant Phase -1:
      264 MW Power Plant at ADEN Yemen -
      Design, Review, Electrical, Instrumentation, Civil, Process, HSE & Mechanical Construction Supervision, QA/QC, Testing, Commissioning and Start-Up for installing of 2 X 9E’s (2 x 132MW) LCO/LDO turbines.
  • Substations
    • Project N-13103 :
      Replacement of existing Fault Monitoring Systems (FMS) in nine Sub Stations in Al Ain region due to reasons of aging and/or obsolescence -
      The list of Stations are as follows:
      DHMG - 400 kV , DHMG - 220 kV, AHYG - 220 kV, SNYG - 220 kV, MZDG - 220 kV, ARDG - 220 kV, AAPS - 220 kV
      CTCG - 220 kV, KHZG - 220 kV
    • Project N-16586:
      Replacement of Obsolete Bus Bar & Circuit Breaker Fail Protection Systems in UNPS, MOS1 & AAPS Substations -
      In this project, the existing bus bar and breaker failure protection systems shall be replaced by new low impedance type combined bus bar and breaker failure protection system in UNPS 132kV, MOS1 132kV and AAPS 220kV substation; including associated power/control cables & accessories.
    • Project N-16595:
      Replacement of existing old Protection Panels, AVR&TPI Panels, Fault Monitoring System and Event Recorder System at Al Wagan Grid Station -
      In Al Wagan 220/33 kV Grid Station, there are OHL feeder protection, Bus Section bay protection, 220/33KV 80MVA Transformer, 220/33/11KV 80MVA Transformer & Busbar/Breaker Failure protection panels supplied by ABB and Fault Monitoring System, Event Recorder System and AVR&TPI System supplied by SIEMENS is available. PESCO is replacing existing Protection panels, AVR/TPI system panels, Fault Monitoring System panels & Event Recorder System panels with new Protection panels, AVR/TPI system panels, Fault Monitoring System panels & Event Recorder System panels as per DOE standard specifications for Control & Protection.